When is board approval needed for a renovation?

Approval is required for work on load-bearing structures, changes to drainage, heating, gas or water installations, and other substantial alterations of the flat. Without approval the right of use may be forfeited.

Share this page

Source status

  • Source reference registered, source text not re-verified

    SFS 1991:614

    Read date

  • Source reference registered, source text not re-verified

    SFS 2010:900

    Read date

What the source says

  • Chapter 7 section 7: approval is required for load-bearing work and for changes to installations.
  • Chapter 7 section 7: the board may refuse only where the work causes significant harm or nuisance to the association.
  • Chapter 7 section 18: substantial alteration without approval may lead to forfeiture of the right of use.

Source rows

  • Bostadsrättslagen
    SFS 1991:614 · The Rent and Tenancy Tribunal decides disputes · Retrieved 2026-08-20
  • PBL
    SFS 2010:900 · The municipal building committee, with Boverket as central authority · Retrieved 2026-08-20

For the owner, landlord or seller

Ask for the approval in writing and keep the drawings, they show what was approved.

For the tenant, buyer or client

The board must assess the application on the merits, a refusal requires significant harm or nuisance.

Next step

Read the approval requirement together with the permit question, larger works may need both.

The page states what the source says under the stated conditions. It is not advice in an individual matter.

Next step

Three ways to put the register to work in your own practice.

Start with your task