Court of Justice of the European Union · Judgment

C-31/18„Elektrorazpredelenie Yug“ EAD v Komisia za energiyno i vodno regulirane (KEVR)

Decided
2019-10-17
ECLI
ECLI:EU:C:2019:868
CELEX
62018CJ0031
Finality
Final, the decision cannot be appealed

The court's own keywords

Reference for a preliminary ruling — Directive 2009/72/EC — Internal market in electricity — Article 2(3) to (6) — Concepts of electricity transmission system and electricity distribution system — Distinguishing criteria — Voltage — Ownership of installations — Article 17(1)(a) — Independent transmission operator — Articles 24 and 26 — Distribution system operator — Article 32(1) — Free third-party access — Access to medium-voltage electricity — Interconnection points between transmission and distribution systems — Discretion of the Member States.

Interprets

    Read from EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) on 2026-08-22.

    The row repeats what the source states. It is not a summary, not a conclusion about any single case and not legal advice.

    Verifiable trust signals

    • Six fixed blocks, one source per line
    • No sentence written by a language model
    • Engine version and read date on every answer
    • No customer data, no documents, no advice
    • Model card and audit published under the EU AI Act

    Model cardAudit