Rättskällor med officiella primärkällor

Utskrivet ·

Hopp til innhold
Hopp til svaret

Tilbake til avgjørelsene

EU-domstolen · Dom

C-489/15CTL Logistics GmbH v DB Netz AG

Avgjort
2017-11-09
ECLI
ECLI:EU:C:2017:834
CELEX
62015CJ0489
Rettskraft
Endelig, avgjørelsen kan ikke ankes

Domstolens egne nøkkelord

Reference for a preliminary ruling — Rail transport — Directive 2001/14/EC — Infrastructure charges — Pricing — National regulatory body monitoring the conformity of those infrastructure charges with that directive — Contract for use of infrastructure concluded between a railway infrastructure manager and a railway undertaking — Principle of non-discrimination — Reimbursement of the charges without intervention by that body and outside the claims procedures involving it — National legislation enabling the civil courts to set a fair amount in the case of unfair charges.

Tolker

    Lest hos EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) den 2026-08-22.

    Raden gjengir det kilden skriver. Den er ikke et referat, ikke en konklusjon om en enkelt sak og ikke juridisk rådgivning.

    Kontrollerbare tillitssignaler

    • Seks faste blokker, én kilde per linje
    • Ingen setning skrevet av en språkmodell
    • Motorversjon og lesedato på hvert svar
    • Ingen kundedata, ingen dokumenter, ingen rådgivning
    • Modellkort og revisjon publisert etter AI-forordningen

    ModellkortRevisjon