EU-domstolen · Dom
C-441/17European Commission v Republic of Poland
- Avgjort
- 2018-04-17
- ECLI
- ECLI:EU:C:2018:255
- CELEX
- 62017CJ0441
- Rettskraft
- Endelig, avgjørelsen kan ikke ankes
Domstolens egne nøkkelord
Failure of a Member State to fulfil obligations — Environment — Directive 92/43/EEC — Conservation of natural habitats and of wild fauna and flora — Article 6(1) and (3) — Article 12(1) — Directive 2009/147/EC — Conservation of wild birds — Articles 4 and 5 — ‘Puszcza Białowieska’ Natura 2000 site — Amendment of the forest management plan — Increase in the volume of harvestable timber — Plan or project not directly necessary to the management of the site that is likely to have a significant effect on it — Appropriate assessment of the implications for the site — Adverse effect on the integrity of the site — Actual implementation of the conservation measures — Effects on the breeding sites and resting places of the protected species.
Tolker
Lest hos EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) den 2026-08-22.
Raden gjengir det kilden skriver. Den er ikke et referat, ikke en konklusjon om en enkelt sak og ikke juridisk rådgivning.
Kontrollerbare tillitssignaler
- Seks faste blokker, én kilde per linje
- Ingen setning skrevet av en språkmodell
- Motorversjon og lesedato på hvert svar
- Ingen kundedata, ingen dokumenter, ingen rådgivning
- Modellkort og revisjon publisert etter AI-forordningen