Rättskällor med officiella primärkällor

Utskrivet ·

Hopp til innhold
Hopp til svaret

Tilbake til avgjørelsene

EU-domstolen · Dom

C-268/23European Commission v French Republic

Avgjort
2024-10-04
ECLI
ECLI:EU:C:2024:864
CELEX
62023CJ0268
Rettskraft
Endelig, avgjørelsen kan ikke ankes

Domstolens egne nøkkelord

Failure of a Member State to fulfil obligations – Environment – Directive 91/271/EEC – Treatment of urban waste water – Article 4 – Obligation to ensure secondary or equivalent treatment of urban waste water entering collecting systems – Article 5 – Sensitive areas – Article 10 – Obligation to ensure that urban waste water treatment plants are designed, constructed, operated and maintained to ensure sufficient performance – Article 15 – Obligation to monitor – Annex I B and D – Control of discharges from urban waste water treatment plants.

Tolker

    Lest hos EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) den 2026-08-22.

    Raden gjengir det kilden skriver. Den er ikke et referat, ikke en konklusjon om en enkelt sak og ikke juridisk rådgivning.

    Kontrollerbare tillitssignaler

    • Seks faste blokker, én kilde per linje
    • Ingen setning skrevet av en språkmodell
    • Motorversjon og lesedato på hvert svar
    • Ingen kundedata, ingen dokumenter, ingen rådgivning
    • Modellkort og revisjon publisert etter AI-forordningen

    ModellkortRevisjon