EU-domstolen · Dom
C-268/23European Commission v French Republic
- Avgjort
- 2024-10-04
- ECLI
- ECLI:EU:C:2024:864
- CELEX
- 62023CJ0268
- Rettskraft
- Endelig, avgjørelsen kan ikke ankes
Domstolens egne nøkkelord
Failure of a Member State to fulfil obligations – Environment – Directive 91/271/EEC – Treatment of urban waste water – Article 4 – Obligation to ensure secondary or equivalent treatment of urban waste water entering collecting systems – Article 5 – Sensitive areas – Article 10 – Obligation to ensure that urban waste water treatment plants are designed, constructed, operated and maintained to ensure sufficient performance – Article 15 – Obligation to monitor – Annex I B and D – Control of discharges from urban waste water treatment plants.
Tolker
Lest hos EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) den 2026-08-22.
Raden gjengir det kilden skriver. Den er ikke et referat, ikke en konklusjon om en enkelt sak og ikke juridisk rådgivning.
Kontrollerbare tillitssignaler
- Seks faste blokker, én kilde per linje
- Ingen setning skrevet av en språkmodell
- Motorversjon og lesedato på hvert svar
- Ingen kundedata, ingen dokumenter, ingen rådgivning
- Modellkort og revisjon publisert etter AI-forordningen