EU-domstolen · Dom
C-11/22Est Wind Power OÜ v AS Elering
- Avgjort
- 2023-10-12
- ECLI
- ECLI:EU:C:2023:765
- CELEX
- 62022CJ0011
- Rettskraft
- Endelig, avgjørelsen kan ikke ankes
Domstolens egne nøkkelord
Reference for a preliminary ruling – Aid granted by Member States – Renewable energy subsidy – Construction of a wind farm – Communication from the Commission entitled ‘Guidelines on State aid for environmental protection and energy 2014-2020’ – Paragraph 19(44) and footnote 66 – Concepts of ‘start of works’, ‘construction works on the investment’, ‘other commitment that makes the investment irreversible’ and ‘necessary state authorisation for constructing the project’ – Type and intensity of the scrutiny that must be conducted by the competent national authority.
Tolker
Lest hos EU:s publikationsbyrå, Cellar (EUR-Lex och CURIA) den 2026-08-22.
Raden gjengir det kilden skriver. Den er ikke et referat, ikke en konklusjon om en enkelt sak og ikke juridisk rådgivning.
Kontrollerbare tillitssignaler
- Seks faste blokker, én kilde per linje
- Ingen setning skrevet av en språkmodell
- Motorversjon og lesedato på hvert svar
- Ingen kundedata, ingen dokumenter, ingen rådgivning
- Modellkort og revisjon publisert etter AI-forordningen