  "attribution": {
    "source": "legal.exploreworldai.com",
    "canonical": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:washctapp-88259-7-2026-09-21",
    "cite_as": "NovaCopilot, legal.exploreworldai.com (https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:washctapp-88259-7-2026-09-21)",
    "license": "https://legal.exploreworldai.com/revision",
    "version": "legal-2026-10-20",
    "fingerprint": "ewai:us:49b4aa",
    "proof": "sha256:2592940e125c00d338ca9cd6f2282996303b6b4c8cd888fadfcda6271f7a7e5d",
    "jurisdiction": "us",
    "lang": "en",
    "publisher": "NovaCopilot by ExploreWorld Legal",
    "terms": "https://legal.exploreworldai.com/om"
  },
  "brand_source": "Source: NovaCopilot",
  "item": {
    "schema_version": "1.0.0",
    "id": "us:washctapp-88259-7-2026-09-21",
    "jurisdiction": "us",
    "lang": "en",
    "brand_source": "Source: NovaCopilot",
    "brand": {
      "product": "NovaCopilot",
      "platform": "ExploreWorldAI",
      "infrastructure": "ExploreWorld Legal",
      "infrastructure_url": "legal.exploreworldai.com",
      "legal_entity": "Valkiv Ventures AB",
      "permanent_url": "https://legal.exploreworldai.com/novacopilot",
      "source": "Source: NovaCopilot",
      "powered_by": "Powered by NovaCopilot",
      "license": "https://legal.exploreworldai.com/licensvillkor"
    },
    "sections": [
      {
        "title": "Front matter",
        "paragraphs": [
          "para_1",
          "para_2",
          "para_3",
          "para_4",
          "para_5",
          "para_6",
          "para_7",
          "para_8",
          "para_9",
          "para_10",
          "para_11",
          "para_12",
          "para_13",
          "para_14",
          "para_15",
          "para_16",
          "para_17",
          "para_18",
          "para_19",
          "para_20",
          "para_21",
          "para_22",
          "para_23",
          "para_24",
          "para_25",
          "para_26",
          "para_27",
          "para_28",
          "para_29",
          "para_30",
          "para_31",
          "para_32",
          "para_33",
          "para_34",
          "para_35",
          "para_36",
          "para_37",
          "para_38",
          "para_39",
          "para_40",
          "para_41",
          "para_42",
          "para_43",
          "para_44",
          "para_45",
          "para_46",
          "para_47",
          "para_48",
          "para_49",
          "para_50",
          "para_51",
          "para_52",
          "para_53",
          "para_54",
          "para_55",
          "para_56",
          "para_57",
          "para_58",
          "para_59",
          "para_60",
          "para_61",
          "para_62",
          "para_63",
          "para_64",
          "para_65",
          "para_66",
          "para_67",
          "para_68",
          "para_69",
          "para_70",
          "para_71",
          "para_72",
          "para_73",
          "para_74",
          "para_75",
          "para_76",
          "para_77",
          "para_78",
          "para_79",
          "para_80",
          "para_81",
          "para_82",
          "para_83",
          "para_84",
          "para_85",
          "para_86",
          "para_87",
          "para_88",
          "para_89",
          "para_90",
          "para_91",
          "para_92",
          "para_93",
          "para_94",
          "para_95",
          "para_96",
          "para_97",
          "para_98",
          "para_99",
          "para_100",
          "para_101",
          "para_102",
          "para_103",
          "para_104",
          "para_105",
          "para_106",
          "para_107",
          "para_108",
          "para_109",
          "para_110",
          "para_111",
          "para_112",
          "para_113",
          "para_114",
          "para_115",
          "para_116",
          "para_117",
          "para_118",
          "para_119",
          "para_120",
          "para_121",
          "para_122",
          "para_123",
          "para_124",
          "para_125",
          "para_126",
          "para_127",
          "para_128",
          "para_129",
          "para_130",
          "para_131",
          "para_132",
          "para_133",
          "para_134",
          "para_135",
          "para_136",
          "para_137",
          "para_138",
          "para_139",
          "para_140",
          "para_141",
          "para_142",
          "para_143",
          "para_144",
          "para_145",
          "para_146",
          "para_147",
          "para_148",
          "para_149",
          "para_150",
          "para_151",
          "para_152",
          "para_153",
          "para_154",
          "para_155",
          "para_156",
          "para_157",
          "para_158",
          "para_159",
          "para_160",
          "para_161",
          "para_162",
          "para_163",
          "para_164",
          "para_165",
          "para_166",
          "para_167",
          "para_168",
          "para_169",
          "para_170",
          "para_171",
          "para_172",
          "para_173",
          "para_174",
          "para_175",
          "para_176",
          "para_177",
          "para_178",
          "para_179",
          "para_180",
          "para_181",
          "para_182",
          "para_183",
          "para_184",
          "para_185",
          "para_186",
          "para_187",
          "para_188",
          "para_189",
          "para_190",
          "para_191",
          "para_192",
          "para_193",
          "para_194",
          "para_195",
          "para_196",
          "para_197",
          "para_198",
          "para_199",
          "para_200",
          "para_201",
          "para_202",
          "para_203",
          "para_204",
          "para_205",
          "para_206",
          "para_207",
          "para_208",
          "para_209",
          "para_210",
          "para_211",
          "para_212",
          "para_213",
          "para_214",
          "para_215",
          "para_216",
          "para_217",
          "para_218",
          "para_219",
          "para_220",
          "para_221",
          "para_222",
          "para_223",
          "para_224",
          "para_225",
          "para_226",
          "para_227",
          "para_228",
          "para_229",
          "para_230",
          "para_231",
          "para_232",
          "para_233",
          "para_234",
          "para_235",
          "para_236",
          "para_237",
          "para_238",
          "para_239",
          "para_240",
          "para_241",
          "para_242",
          "para_243",
          "para_244",
          "para_245",
          "para_246",
          "para_247",
          "para_248",
          "para_249",
          "para_250",
          "para_251",
          "para_252",
          "para_253",
          "para_254",
          "para_255",
          "para_256",
          "para_257",
          "para_258",
          "para_259",
          "para_260",
          "para_261",
          "para_262",
          "para_263",
          "para_264",
          "para_265",
          "para_266",
          "para_267",
          "para_268",
          "para_269",
          "para_270",
          "para_271",
          "para_272",
          "para_273",
          "para_274",
          "para_275",
          "para_276",
          "para_277",
          "para_278",
          "para_279",
          "para_280",
          "para_281",
          "para_282",
          "para_283",
          "para_284",
          "para_285",
          "para_286",
          "para_287",
          "para_288",
          "para_289",
          "para_290",
          "para_291",
          "para_292",
          "para_293",
          "para_294",
          "para_295",
          "para_296",
          "para_297",
          "para_298",
          "para_299",
          "para_300",
          "para_301",
          "para_302",
          "para_303",
          "para_304",
          "para_305",
          "para_306",
          "para_307",
          "para_308",
          "para_309",
          "para_310",
          "para_311",
          "para_312",
          "para_313",
          "para_314",
          "para_315",
          "para_316",
          "para_317",
          "para_318",
          "para_319",
          "para_320",
          "para_321",
          "para_322",
          "para_323",
          "para_324",
          "para_325",
          "para_326",
          "para_327",
          "para_328",
          "para_329",
          "para_330",
          "para_331",
          "para_332",
          "para_333",
          "para_334",
          "para_335",
          "para_336",
          "para_337",
          "para_338",
          "para_339",
          "para_340",
          "para_341",
          "para_342",
          "para_343",
          "para_344",
          "para_345",
          "para_346",
          "para_347",
          "para_348",
          "para_349",
          "para_350",
          "para_351",
          "para_352",
          "para_353",
          "para_354",
          "para_355",
          "para_356",
          "para_357",
          "para_358",
          "para_359",
          "para_360",
          "para_361",
          "para_362",
          "para_363",
          "para_364",
          "para_365",
          "para_366",
          "para_367",
          "para_368",
          "para_369",
          "para_370",
          "para_371",
          "para_372",
          "para_373",
          "para_374",
          "para_375",
          "para_376",
          "para_377",
          "para_378",
          "para_379",
          "para_380",
          "para_381",
          "para_382",
          "para_383",
          "para_384",
          "para_385",
          "para_386",
          "para_387",
          "para_388",
          "para_389",
          "para_390",
          "para_391",
          "para_392",
          "para_393",
          "para_394",
          "para_395",
          "para_396",
          "para_397",
          "para_398",
          "para_399",
          "para_400",
          "para_401",
          "para_402",
          "para_403",
          "para_404",
          "para_405",
          "para_406",
          "para_407",
          "para_408",
          "para_409",
          "para_410",
          "para_411",
          "para_412",
          "para_413",
          "para_414",
          "para_415",
          "para_416",
          "para_417",
          "para_418",
          "para_419",
          "para_420",
          "para_421",
          "para_422",
          "para_423",
          "para_424",
          "para_425",
          "para_426",
          "para_427",
          "para_428",
          "para_429",
          "para_430",
          "para_431",
          "para_432",
          "para_433",
          "para_434",
          "para_435",
          "para_436",
          "para_437",
          "para_438",
          "para_439",
          "para_440",
          "para_441",
          "para_442",
          "para_443",
          "para_444",
          "para_445",
          "para_446",
          "para_447",
          "para_448",
          "para_449",
          "para_450",
          "para_451",
          "para_452",
          "para_453",
          "para_454",
          "para_455",
          "para_456",
          "para_457",
          "para_458",
          "para_459",
          "para_460",
          "para_461",
          "para_462",
          "para_463",
          "para_464",
          "para_465",
          "para_466",
          "para_467",
          "para_468",
          "para_469",
          "para_470",
          "para_471",
          "para_472",
          "para_473",
          "para_474",
          "para_475",
          "para_476",
          "para_477",
          "para_478",
          "para_479",
          "para_480",
          "para_481",
          "para_482",
          "para_483",
          "para_484",
          "para_485",
          "para_486",
          "para_487",
          "para_488",
          "para_489",
          "para_490",
          "para_491",
          "para_492",
          "para_493",
          "para_494",
          "para_495",
          "para_496",
          "para_497",
          "para_498",
          "para_499",
          "para_500",
          "para_501",
          "para_502",
          "para_503",
          "para_504",
          "para_505",
          "para_506",
          "para_507",
          "para_508",
          "para_509",
          "para_510",
          "para_511",
          "para_512",
          "para_513",
          "para_514",
          "para_515",
          "para_516",
          "para_517",
          "para_518",
          "para_519",
          "para_520",
          "para_521",
          "para_522",
          "para_523",
          "para_524"
        ],
        "kind": "front_matter"
      }
    ],
    "paragraphs": [
      {
        "text": "IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON",
        "paragraph_id": "para_1"
      },
      {
        "text": "COLUMBIA RIVERKEEPER and",
        "paragraph_id": "para_2"
      },
      {
        "text": "CONFEDERATED TRIBES AND",
        "paragraph_id": "para_3"
      },
      {
        "text": "BANDS OF THE YAKAMA NATION,",
        "paragraph_id": "para_4"
      },
      {
        "text": "Appellants,",
        "paragraph_id": "para_5"
      },
      {
        "text": "v.",
        "paragraph_id": "para_6"
      },
      {
        "text": "STATE OF WASHINGTON",
        "paragraph_id": "para_7"
      },
      {
        "text": "POLLUTION CONTROL HEARINGS",
        "paragraph_id": "para_8"
      },
      {
        "text": "BOARD,",
        "paragraph_id": "para_9"
      },
      {
        "text": "Defendant,",
        "paragraph_id": "para_10"
      },
      {
        "text": "STATE OF WASHINGTON,",
        "paragraph_id": "para_11"
      },
      {
        "text": "DEPARTMENT OF ECOLOGY and",
        "paragraph_id": "para_12"
      },
      {
        "text": "FLOW POWER PROJECT 101 c/o",
        "paragraph_id": "para_13"
      },
      {
        "text": "RYE DEVELOPMENT,",
        "paragraph_id": "para_14"
      },
      {
        "text": "Respondents.",
        "paragraph_id": "para_15"
      },
      {
        "text": "No. 88259-7-I",
        "paragraph_id": "para_16"
      },
      {
        "text": "DIVISION ONE",
        "paragraph_id": "para_17"
      },
      {
        "text": "PUBLISHED OPINION",
        "paragraph_id": "para_18"
      },
      {
        "text": "MANN, J. — Under § 401 of the federal Clean Water Act (CWA), any applicant for",
        "paragraph_id": "para_19"
      },
      {
        "text": "a federal license or permit to conduct an activity that may result in any discharge into",
        "paragraph_id": "para_20"
      },
      {
        "text": "navigable waters, must provide a certification from the state where the discharge",
        "paragraph_id": "para_21"
      },
      {
        "text": "originates that any such discharge will comply with federally approved water quality",
        "paragraph_id": "para_22"
      },
      {
        "text": "standards. 33 U.S.C. § 1341. The Department of Ecology (Ecology) is the designated",
        "paragraph_id": "para_23"
      },
      {
        "text": "No. 88259-7-I/2",
        "paragraph_id": "para_24"
      },
      {
        "text": "-2-",
        "paragraph_id": "para_25"
      },
      {
        "text": "state water pollution control agency tasked with implementing the CWA and § 401 in",
        "paragraph_id": "para_26"
      },
      {
        "text": "Washington. RCW 90.48.260(1).",
        "paragraph_id": "para_27"
      },
      {
        "text": "On May 22, 2023, Ecology issued a § 401 water quality certification (§ 401",
        "paragraph_id": "para_28"
      },
      {
        "text": "certification) to Free Flow Project 101 LLC (FFP) for the Goldendale Energy Storage",
        "paragraph_id": "para_29"
      },
      {
        "text": "Project (project), a proposed pumped-water storage hydropower system adjacent to, but",
        "paragraph_id": "para_30"
      },
      {
        "text": "off-stream of, the Columbia River. Columbia Riverkeeper (Riverkeeper) and the",
        "paragraph_id": "para_31"
      },
      {
        "text": "Confederated Tribes and Bands of the Yakama Nation (Yakama Nation) appealed the §",
        "paragraph_id": "para_32"
      },
      {
        "text": "401 certification to the Pollution Control Hearings Board (PCHB). The PCHB affirmed",
        "paragraph_id": "para_33"
      },
      {
        "text": "the § 401 certification on January 27, 2025, issuing findings of fact, conclusions of law,",
        "paragraph_id": "para_34"
      },
      {
        "text": "and an order (final order).",
        "paragraph_id": "para_35"
      },
      {
        "text": "Riverkeeper and the Yakama Nation appeal the PCHB’s order and make several",
        "paragraph_id": "para_36"
      },
      {
        "text": "arguments, including that the § 401 certification fails to impose the necessary conditions",
        "paragraph_id": "para_37"
      },
      {
        "text": "and monitoring requirements to protect the water quality of the Columbia River.",
        "paragraph_id": "para_38"
      },
      {
        "text": "We conclude that the PCHB erred in finding 16 of the final order—that any",
        "paragraph_id": "para_39"
      },
      {
        "text": "leakage from the project’s tunnels would be monitored and reported. As a result, we set",
        "paragraph_id": "para_40"
      },
      {
        "text": "aside the § 401 certification on this limited issue. We remand for further proceedings for",
        "paragraph_id": "para_41"
      },
      {
        "text": "Ecology and the PCHB to impose monitoring and reporting requirements to detect",
        "paragraph_id": "para_42"
      },
      {
        "text": "leakage from the project’s tunnels. We otherwise affirm the § 401 certification.",
        "paragraph_id": "para_43"
      },
      {
        "text": "I. BACKGROUND",
        "paragraph_id": "para_44"
      },
      {
        "text": "A. The Project",
        "paragraph_id": "para_45"
      },
      {
        "text": "The project is a closed-loop hydroelectric power plant that generates electricity",
        "paragraph_id": "para_46"
      },
      {
        "text": "during times of greater energy needs by releasing water from an upper reservoir",
        "paragraph_id": "para_47"
      },
      {
        "text": "No. 88259-7-I/3",
        "paragraph_id": "para_48"
      },
      {
        "text": "-3-",
        "paragraph_id": "para_49"
      },
      {
        "text": "downhill to a lower reservoir.1 During periods of low energy demand, water would be",
        "paragraph_id": "para_50"
      },
      {
        "text": "pumped back up to the upper reservoir. The reservoirs would be off-stream of the",
        "paragraph_id": "para_51"
      },
      {
        "text": "Columbia River, with no river or stream impoundments, and vertically separated by",
        "paragraph_id": "para_52"
      },
      {
        "text": "2,400 feet of elevation. Due to its closed-loop design, water would be drawn from an",
        "paragraph_id": "para_53"
      },
      {
        "text": "existing pump station to initially fill the system and additional water would be drawn as",
        "paragraph_id": "para_54"
      },
      {
        "text": "needed to offset any water loss.",
        "paragraph_id": "para_55"
      },
      {
        "text": "The project area is approximately 681.6 acres. The lower reservoir would be",
        "paragraph_id": "para_56"
      },
      {
        "text": "located on the site of the former Columbia Gorge Aluminum smelter (CGA smelter).",
        "paragraph_id": "para_57"
      },
      {
        "text": "The CGA smelter is contaminated with sulfate and phosphate from the former smelter",
        "paragraph_id": "para_58"
      },
      {
        "text": "operations.",
        "paragraph_id": "para_59"
      },
      {
        "text": "The project entails the construction of (1) the upper and lower reservoirs, (2) an",
        "paragraph_id": "para_60"
      },
      {
        "text": "underground conveyance system connecting the upper reservoir to the lower reservoir",
        "paragraph_id": "para_61"
      },
      {
        "text": "and passing through an underground powerhouse with generating and pumping",
        "paragraph_id": "para_62"
      },
      {
        "text": "facilities, (3) an access tunnel, (4) an underground and overhead transmission line, (5) a",
        "paragraph_id": "para_63"
      },
      {
        "text": "substation, and (6) accompanying facilities.",
        "paragraph_id": "para_64"
      },
      {
        "text": "The project would affect Stream 7, Stream 8, and Swale Creek, which are",
        "paragraph_id": "para_65"
      },
      {
        "text": "specific locations within the construction area. FFP proposes to discharge reservoir",
        "paragraph_id": "para_66"
      },
      {
        "text": "water into Swale Creek to mitigate the project’s impacts on Stream 7 and Stream 8.",
        "paragraph_id": "para_67"
      },
      {
        "text": "B. Environmental Impact Statement",
        "paragraph_id": "para_68"
      },
      {
        "text": "Ecology issued a Final Environmental Impact Statement (EIS) on December 21,",
        "paragraph_id": "para_69"
      },
      {
        "text": "2022. The EIS evaluated potential impacts related to the construction and operation of",
        "paragraph_id": "para_70"
      },
      {
        "text": "1 The background is taken largely from the unchallenged findings of fact in the final order. We",
        "paragraph_id": "para_71"
      },
      {
        "text": "treat unchallenged findings as verities on appeal. Cowiche Canyon Conservancy v. Bosley, 118 Wn.2d",
        "paragraph_id": "para_72"
      },
      {
        "text": "801, 808, 828 P.2d 549 (1992).",
        "paragraph_id": "para_73"
      },
      {
        "text": "No. 88259-7-I/4",
        "paragraph_id": "para_74"
      },
      {
        "text": "-4-",
        "paragraph_id": "para_75"
      },
      {
        "text": "the project on wetlands, regulated waters, water quantity, water quality, and water rights",
        "paragraph_id": "para_76"
      },
      {
        "text": "for both surface and groundwater. For water quality, the EIS stated that “yearly",
        "paragraph_id": "para_77"
      },
      {
        "text": "evaporative cycles would concentrate water quality constituent levels over time (e.g.,",
        "paragraph_id": "para_78"
      },
      {
        "text": "heat, total dissolved solids, metals, nutrients, and bacteria), despite the annual addition",
        "paragraph_id": "para_79"
      },
      {
        "text": "of fresh make-up water from annual precipitation and purchases of water from the",
        "paragraph_id": "para_80"
      },
      {
        "text": "Columbia River.” The project’s upper and lower reservoirs would be constructed with a",
        "paragraph_id": "para_81"
      },
      {
        "text": "synthetic liner system with leak-detection capabilities meant to prevent leakage, such",
        "paragraph_id": "para_82"
      },
      {
        "text": "that “negligible seepage from the reservoirs is anticipated.” The “lower reservoir is",
        "paragraph_id": "para_83"
      },
      {
        "text": "anticipated to include a double liner system to further minimize any potential for",
        "paragraph_id": "para_84"
      },
      {
        "text": "leakage.” In addition, FFP plans to “include hydrologic/groundwater level monitoring as",
        "paragraph_id": "para_85"
      },
      {
        "text": "a component of the broader water quality and response plan.”",
        "paragraph_id": "para_86"
      },
      {
        "text": "Ecology concluded that “[t]hrough compliance with laws and with implementation",
        "paragraph_id": "para_87"
      },
      {
        "text": "of the mitigation measures described in [the EIS], there would be no significant and",
        "paragraph_id": "para_88"
      },
      {
        "text": "unavoidable adverse impacts related to water resources from construction or operation",
        "paragraph_id": "para_89"
      },
      {
        "text": "of the proposed project.” Nonetheless, the EIS also states that approximately 100 acre-",
        "paragraph_id": "para_90"
      },
      {
        "text": "feet of water per year (AFY) would leak from the project’s underground infrastructure",
        "paragraph_id": "para_91"
      },
      {
        "text": "(piping, etc.), which would represent return flow (or artificial recharge) into the basalt",
        "paragraph_id": "para_92"
      },
      {
        "text": "aquifer system. The EIS assumes that 70 percent of the underground leakage would",
        "paragraph_id": "para_93"
      },
      {
        "text": "enter the Columbia River tributaries watershed and 30 percent would enter the Swale",
        "paragraph_id": "para_94"
      },
      {
        "text": "Creek watershed.",
        "paragraph_id": "para_95"
      },
      {
        "text": "C. § 401 Certification",
        "paragraph_id": "para_96"
      },
      {
        "text": "Because FFP applied to the Federal Energy Regulatory Commission (FERC) for",
        "paragraph_id": "para_97"
      },
      {
        "text": "a federal hydropower license, it was required to seek a § 401 certification from Ecology.",
        "paragraph_id": "para_98"
      },
      {
        "text": "No. 88259-7-I/5",
        "paragraph_id": "para_99"
      },
      {
        "text": "-5-",
        "paragraph_id": "para_100"
      },
      {
        "text": "33 U.S.C. § 1341(a)(1). Issuance of a § 401 certification affirms that discharges will",
        "paragraph_id": "para_101"
      },
      {
        "text": "comply with the water quality requirements of the CWA, including the federally approved",
        "paragraph_id": "para_102"
      },
      {
        "text": "water quality standards set by the State. 33 U.S.C. § 1341(a)(1). PUD No. 1 of",
        "paragraph_id": "para_103"
      },
      {
        "text": "Jefferson County v. Wash. Dep’t of Ecology, 511 U.S. 700, 707-08, 114 S. Ct. 1900,",
        "paragraph_id": "para_104"
      },
      {
        "text": "128 L. Ed. 2d 716 (1994).",
        "paragraph_id": "para_105"
      },
      {
        "text": "When Ecology issued the § 401 certification for the project, Environmental",
        "paragraph_id": "para_106"
      },
      {
        "text": "Protection Agency (EPA) regulations—known as the 2020 rule—applied and",
        "paragraph_id": "para_107"
      },
      {
        "text": "constrained the scope of Ecology’s analysis. Under the 2020 rule, the scope of",
        "paragraph_id": "para_108"
      },
      {
        "text": "Ecology’s § 401 analysis “is limited to assuring that a discharge from a federally",
        "paragraph_id": "para_109"
      },
      {
        "text": "licensed or permitted activity will comply with water quality requirements.” 40 C.F.R. §",
        "paragraph_id": "para_110"
      },
      {
        "text": "121.3 (2020) (emphasis added).",
        "paragraph_id": "para_111"
      },
      {
        "text": "The project’s § 401 certification requires FFP to acquire additional permits,",
        "paragraph_id": "para_112"
      },
      {
        "text": "including a § 402 National Pollutant Discharge Elimination System (NPDES) permit",
        "paragraph_id": "para_113"
      },
      {
        "text": "before discharging any wastewater into the Swale Creek drainage. FFP must also",
        "paragraph_id": "para_114"
      },
      {
        "text": "obtain a surface reservoir permit and a construction stormwater general permit. FFP",
        "paragraph_id": "para_115"
      },
      {
        "text": "must conduct water quality monitoring in accordance with an established water quality",
        "paragraph_id": "para_116"
      },
      {
        "text": "monitoring plan (WQMP). FFP is also required to remove and dispose of the contents",
        "paragraph_id": "para_117"
      },
      {
        "text": "of a waste disposal site called the West Surface Impoundment (WSI), which is located",
        "paragraph_id": "para_118"
      },
      {
        "text": "within the former CGA smelter site. The cleanup process includes addressing any",
        "paragraph_id": "para_119"
      },
      {
        "text": "contaminated soils, as well as the decommissioning and replacement of 15 groundwater",
        "paragraph_id": "para_120"
      },
      {
        "text": "monitoring wells associated with the former CGA smelter. Cleanup at the WSI must be",
        "paragraph_id": "para_121"
      },
      {
        "text": "completed and approved by Ecology before conducting any ground disturbance",
        "paragraph_id": "para_122"
      },
      {
        "text": "construction activities at the former CGA smelter site.",
        "paragraph_id": "para_123"
      },
      {
        "text": "No. 88259-7-I/6",
        "paragraph_id": "para_124"
      },
      {
        "text": "-6-",
        "paragraph_id": "para_125"
      },
      {
        "text": "D. Procedural History",
        "paragraph_id": "para_126"
      },
      {
        "text": "On June 21, 2023, Riverkeeper filed a petition for review before the PCHB",
        "paragraph_id": "para_127"
      },
      {
        "text": "challenging the sufficiency of the § 401 certification in ensuring that the project would",
        "paragraph_id": "para_128"
      },
      {
        "text": "comply with Washington’s water quality standards. That same day, the Yakama Nation",
        "paragraph_id": "para_129"
      },
      {
        "text": "filed a similar appeal with the PCHB. On August 24, 2023, the PCHB granted the",
        "paragraph_id": "para_130"
      },
      {
        "text": "parties’ joint motion for consolidation of the appeals under WAC 371-08-390(9).",
        "paragraph_id": "para_131"
      },
      {
        "text": "A prehearing order was entered on August 31, 2023, and on September 6, 2023,",
        "paragraph_id": "para_132"
      },
      {
        "text": "Riverkeeper and the Yakama Nation submitted their proposed legal issues. On",
        "paragraph_id": "para_133"
      },
      {
        "text": "February 8, 2024, Riverkeeper and the Yakama Nation stipulated that they “do not",
        "paragraph_id": "para_134"
      },
      {
        "text": "intend to pursue a claim that Ecology has failed to comply with [the State Environmental",
        "paragraph_id": "para_135"
      },
      {
        "text": "Policy Act (SEPA),] RCW 43.21C.060, and its implementing regulations, by deciding not",
        "paragraph_id": "para_136"
      },
      {
        "text": "to deny, or further mitigate or condition, the Certification.” On February 14, 2024, the",
        "paragraph_id": "para_137"
      },
      {
        "text": "PCHB entered an amended prehearing order reflecting the stipulated changes to the",
        "paragraph_id": "para_138"
      },
      {
        "text": "legal issues in the case.",
        "paragraph_id": "para_139"
      },
      {
        "text": "The parties filed several motions for summary judgment, which the PCHB",
        "paragraph_id": "para_140"
      },
      {
        "text": "resolved in two orders. In the first order, the PCHB affirmed that the 2020 rule applied",
        "paragraph_id": "para_141"
      },
      {
        "text": "to the § 401 certification and that Ecology’s consideration was limited to whether any",
        "paragraph_id": "para_142"
      },
      {
        "text": "“discharge” would comply with federally approved water quality standards. As a result,",
        "paragraph_id": "para_143"
      },
      {
        "text": "the appellants’ contentions concerning “withdrawal” of water from the Columbia River",
        "paragraph_id": "para_144"
      },
      {
        "text": "were dismissed. In the second order, the PCHB limited which smaller waterbodies",
        "paragraph_id": "para_145"
      },
      {
        "text": "qualified as “impacted waterbodies” for purposes of the § 401 certification.",
        "paragraph_id": "para_146"
      },
      {
        "text": "An open record hearing on the remaining legal issues took place before the",
        "paragraph_id": "para_147"
      },
      {
        "text": "PCHB on September 23-26, 2024 (final hearing). And on January 27, 2025, the PCHB",
        "paragraph_id": "para_148"
      },
      {
        "text": "No. 88259-7-I/7",
        "paragraph_id": "para_149"
      },
      {
        "text": "-7-",
        "paragraph_id": "para_150"
      },
      {
        "text": "issued the final order. In it, the PCHB found, inter alia, that (1) the project was designed",
        "paragraph_id": "para_151"
      },
      {
        "text": "to avoid leakage or seepage and (2) the § 401 certification included conditions to",
        "paragraph_id": "para_152"
      },
      {
        "text": "protect water quality in the unlikely event of a significant leakage. Based on that, the",
        "paragraph_id": "para_153"
      },
      {
        "text": "PCHB concluded that (1) the Columbia River was not an impacted waterbody for",
        "paragraph_id": "para_154"
      },
      {
        "text": "purposes of the § 401 certification and (2) the § 401 certification imposed sufficient",
        "paragraph_id": "para_155"
      },
      {
        "text": "conditions to ensure the project’s compliance with all applicable water quality standards.",
        "paragraph_id": "para_156"
      },
      {
        "text": "The PCHB ultimately affirmed the project’s § 401 certification.",
        "paragraph_id": "para_157"
      },
      {
        "text": "On February 26, 2025, Riverkeeper and the Yakama Nation filed petitions for",
        "paragraph_id": "para_158"
      },
      {
        "text": "review of the final order in Thurston County Superior Court. After granting FFP’s motion",
        "paragraph_id": "para_159"
      },
      {
        "text": "to intervene, the superior court certified the case for transfer to this court as a direct",
        "paragraph_id": "para_160"
      },
      {
        "text": "appeal.",
        "paragraph_id": "para_161"
      },
      {
        "text": "II. POTENTIAL FOR DISCHARGE INTO THE COLUMBIA RIVER",
        "paragraph_id": "para_162"
      },
      {
        "text": "Riverkeeper and the Yakama Nation first argue that Ecology and the PCHB erred",
        "paragraph_id": "para_163"
      },
      {
        "text": "in finding that the project would not leak into the groundwater, and then failed to analyze",
        "paragraph_id": "para_164"
      },
      {
        "text": "whether the leakage was directly connected to, and therefore would discharge into, the",
        "paragraph_id": "para_165"
      },
      {
        "text": "Columbia River.",
        "paragraph_id": "para_166"
      },
      {
        "text": "A. Standard of Review",
        "paragraph_id": "para_167"
      },
      {
        "text": "The court reviews orders from the PCHB under the Washington Administrative",
        "paragraph_id": "para_168"
      },
      {
        "text": "Procedure Act (APA), ch. 34.05 RCW. Port of Seattle v. Pollution Control Hr’gs Bd.,",
        "paragraph_id": "para_169"
      },
      {
        "text": "151 Wn.2d 568, 587, 90 P.3d 659 (2004). Our review is confined to the record before",
        "paragraph_id": "para_170"
      },
      {
        "text": "the PCHB, RCW 34.05.558, and “[t]he burden of demonstrating the invalidity of agency",
        "paragraph_id": "para_171"
      },
      {
        "text": "action is on the party asserting invalidity.” RCW 34.05.570(1)(a). We may grant relief in",
        "paragraph_id": "para_172"
      },
      {
        "text": "three circumstances.",
        "paragraph_id": "para_173"
      },
      {
        "text": "No. 88259-7-I/8",
        "paragraph_id": "para_174"
      },
      {
        "text": "-8-",
        "paragraph_id": "para_175"
      },
      {
        "text": "A PCHB’s order may be invalidated under the APA if it is not supported by",
        "paragraph_id": "para_176"
      },
      {
        "text": "substantial evidence viewing the record as a whole. RCW 34.05.570(3)(e). Substantial",
        "paragraph_id": "para_177"
      },
      {
        "text": "evidence is evidence sufficient to persuade a fair-minded person of the truth or",
        "paragraph_id": "para_178"
      },
      {
        "text": "correctness of the matter. Port of Seattle, 151 Wn.2d at 588. The PCHB’s factual",
        "paragraph_id": "para_179"
      },
      {
        "text": "findings may be overturned only if they are clearly erroneous, such that the court is",
        "paragraph_id": "para_180"
      },
      {
        "text": "“‘definitely and firmly convinced that a mistake has been made.’” Port of Seattle, 151",
        "paragraph_id": "para_181"
      },
      {
        "text": "Wn.2d at 588 (quoting Buechel v. Dep’t of Ecology, 125 Wn.2d 196, 202, 884 P.2d 910",
        "paragraph_id": "para_182"
      },
      {
        "text": "(1994)). The substantial evidence test does not allow reviewing courts to reverse the",
        "paragraph_id": "para_183"
      },
      {
        "text": "PCHB’s findings because they would have ruled differently had they been the trier of",
        "paragraph_id": "para_184"
      },
      {
        "text": "fact. Honeywell v. Dep’t of Ecology, 2 Wn. App. 2d 601, 613, 413 P.3d 41 (2017). Nor",
        "paragraph_id": "para_185"
      },
      {
        "text": "does the court weigh the credibility of witnesses or substitute its judgment for the",
        "paragraph_id": "para_186"
      },
      {
        "text": "PCHB’s. Port of Seattle, 151 Wn.2d at 588.",
        "paragraph_id": "para_187"
      },
      {
        "text": "The court may also grant relief if a PCHB’s order has “erroneously interpreted or",
        "paragraph_id": "para_188"
      },
      {
        "text": "applied the law.” RCW 34.05.570(3)(d). The application of law to the facts is a question",
        "paragraph_id": "para_189"
      },
      {
        "text": "of law that we review de novo. Port of Seattle, 151 Wn.2d at 588. Likewise, where",
        "paragraph_id": "para_190"
      },
      {
        "text": "statutory construction is necessary, the court will interpret statutes de novo. Port of",
        "paragraph_id": "para_191"
      },
      {
        "text": "Seattle, 151 Wn.2d at 587. The court gives due deference to Ecology’s specialized",
        "paragraph_id": "para_192"
      },
      {
        "text": "expertise on technical judgments, and substantial weight to the interpretation of the law",
        "paragraph_id": "para_193"
      },
      {
        "text": "it administers. Port of Seattle, 151 Wn.2d at 588, 594-95.",
        "paragraph_id": "para_194"
      },
      {
        "text": "Lastly, the court may grant relief if a PCHB’s order is “arbitrary or capricious.”",
        "paragraph_id": "para_195"
      },
      {
        "text": "RCW 34.05.570(3)(i). An arbitrary or capricious action is one that is “willful and",
        "paragraph_id": "para_196"
      },
      {
        "text": "unreasoning and taken without regard to the attending facts or circumstances.” Port of",
        "paragraph_id": "para_197"
      },
      {
        "text": "Seattle, 151 Wn.2d at 589. “Where there is room for two opinions, and the agency",
        "paragraph_id": "para_198"
      },
      {
        "text": "No. 88259-7-I/9",
        "paragraph_id": "para_199"
      },
      {
        "text": "-9-",
        "paragraph_id": "para_200"
      },
      {
        "text": "acted honestly and upon due consideration, this court should not find that an action was",
        "paragraph_id": "para_201"
      },
      {
        "text": "arbitrary [or] capricious, even though this court may have reached the opposite",
        "paragraph_id": "para_202"
      },
      {
        "text": "conclusion.” Port of Seattle, 151 Wn.2d at 589. That is because the court should not",
        "paragraph_id": "para_203"
      },
      {
        "text": "“undertake to exercise the discretion that the legislature has placed in the agency.”",
        "paragraph_id": "para_204"
      },
      {
        "text": "RCW 34.05.574(1).",
        "paragraph_id": "para_205"
      },
      {
        "text": "B. Leakage from the Project",
        "paragraph_id": "para_206"
      },
      {
        "text": "The core of Riverkeeper and the Yakama Nation’s appeal is that the PCHB erred",
        "paragraph_id": "para_207"
      },
      {
        "text": "in finding that the project will not leak polluted water into groundwater that is",
        "paragraph_id": "para_208"
      },
      {
        "text": "hydrologically connected to the Columbia River. Both appellants rely on the assumption",
        "paragraph_id": "para_209"
      },
      {
        "text": "in the EIS that the project would leak 100 AFY per year into groundwater. Riverkeeper",
        "paragraph_id": "para_210"
      },
      {
        "text": "and the Yakama Nation contend that Ecology cannot ignore the EIS, and that the PCHB",
        "paragraph_id": "para_211"
      },
      {
        "text": "failed to cite credible evidence in the record showing that the project will not leak. We",
        "paragraph_id": "para_212"
      },
      {
        "text": "disagree.",
        "paragraph_id": "para_213"
      },
      {
        "text": "It is undisputed that the PCHB applies a de novo standard of review, deciding",
        "paragraph_id": "para_214"
      },
      {
        "text": "cases based on all evidence available at the time of the PCHB hearing. Port of Seattle,",
        "paragraph_id": "para_215"
      },
      {
        "text": "151 Wn.2d at 598. In its final order, the PCHB found that the project is designed not to",
        "paragraph_id": "para_216"
      },
      {
        "text": "leak, and if it did, any leakage would be minimal based on considerable evidence.",
        "paragraph_id": "para_217"
      },
      {
        "text": "The PCHB explained that FFP provided credible evidence at the hearing that the",
        "paragraph_id": "para_218"
      },
      {
        "text": "project was designed to avoid leakage.2 For example, Dylan Stankus, the project",
        "paragraph_id": "para_219"
      },
      {
        "text": "manager and environmental engineer, testified as an expert in hydrological modeling",
        "paragraph_id": "para_220"
      },
      {
        "text": "and water quality monitoring. Stankus explained that FFP prepared an informational",
        "paragraph_id": "para_221"
      },
      {
        "text": "2 Once again, appellants did not assign error to the PCHB’s findings of fact and thus they are",
        "paragraph_id": "para_222"
      },
      {
        "text": "considered verities on appeal. We also note that each of the PCHB’s findings include citations to hearing",
        "paragraph_id": "para_223"
      },
      {
        "text": "testimony or exhibits—the evidence that the PCHB relied upon in making said findings.",
        "paragraph_id": "para_224"
      },
      {
        "text": "No. 88259-7-I/10",
        "paragraph_id": "para_225"
      },
      {
        "text": "-10-",
        "paragraph_id": "para_226"
      },
      {
        "text": "presentation for Ecology with hydraulic engineers to discuss how the reservoirs would",
        "paragraph_id": "para_227"
      },
      {
        "text": "be lined to prevent leakage and seepage. Further, Shane McDonald, an expert in",
        "paragraph_id": "para_228"
      },
      {
        "text": "hydrogeology, testified that the lower reservoir (which would be located on the former",
        "paragraph_id": "para_229"
      },
      {
        "text": "CGA smelter site) would have two liners of geomembrane separated by a layer of",
        "paragraph_id": "para_230"
      },
      {
        "text": "sand—such that in the event that water leaked through the first layer, the second layer",
        "paragraph_id": "para_231"
      },
      {
        "text": "would capture it and pump it back into the project’s closed-loop system. That,",
        "paragraph_id": "para_232"
      },
      {
        "text": "McDonald explained, substantially minimizes the chances of leakage into groundwater.",
        "paragraph_id": "para_233"
      },
      {
        "text": "The PCHB also found credible the expert testimony presented by FFP that the",
        "paragraph_id": "para_234"
      },
      {
        "text": "tunnels connecting the two reservoirs would not leak. Michael Wood, a professional",
        "paragraph_id": "para_235"
      },
      {
        "text": "geologist with 37 years of experience, testified as an expert on the geology of pumped",
        "paragraph_id": "para_236"
      },
      {
        "text": "storage hydropower projects. Woods explained that the standard practice for the",
        "paragraph_id": "para_237"
      },
      {
        "text": "construction of tunnels for hydropower projects incorporates specific steps to prevent",
        "paragraph_id": "para_238"
      },
      {
        "text": "leakage: (1) consolidation or pressure grouting around the tunnel, (2) the installation of",
        "paragraph_id": "para_239"
      },
      {
        "text": "a permanent liner system of reinforced concrete or steel, (3) drilling holes into the rock",
        "paragraph_id": "para_240"
      },
      {
        "text": "to inject grout to make the annular space around the tunnel between a monolithic",
        "paragraph_id": "para_241"
      },
      {
        "text": "impermeable mass, and (4) a process called contact grouting, whereby grout is injected",
        "paragraph_id": "para_242"
      },
      {
        "text": "between the final lining and the rock to seal any shrinkage that may have occurred",
        "paragraph_id": "para_243"
      },
      {
        "text": "when the concrete cured after the final lining is installed.",
        "paragraph_id": "para_244"
      },
      {
        "text": "The PCHB also found that during the § 401 certification process, Ecology staff",
        "paragraph_id": "para_245"
      },
      {
        "text": "investigated and were satisfied that the project would not leak or seep a significant",
        "paragraph_id": "para_246"
      },
      {
        "text": "amount of water. For example, Loreé Randall, Ecology’s team lead for the project’s §",
        "paragraph_id": "para_247"
      },
      {
        "text": "401 water quality certification process, testified that Ecology dedicated time to learn the",
        "paragraph_id": "para_248"
      },
      {
        "text": "applicable construction methods to determine whether the project was a closed system",
        "paragraph_id": "para_249"
      },
      {
        "text": "No. 88259-7-I/11",
        "paragraph_id": "para_250"
      },
      {
        "text": "-11-",
        "paragraph_id": "para_251"
      },
      {
        "text": "that would not leak or seep. She explained that Ecology’s intent was to make sure that",
        "paragraph_id": "para_252"
      },
      {
        "text": "the system would not leak from either the reservoirs or the tunnel, and that the",
        "paragraph_id": "para_253"
      },
      {
        "text": "reservoirs would be lined and include a leak detection system.",
        "paragraph_id": "para_254"
      },
      {
        "text": "The PCHB found that the appellants did not provide evidence refuting FFP and",
        "paragraph_id": "para_255"
      },
      {
        "text": "Ecology’s explanation that the project was not designed to leak. Rather than pointing to",
        "paragraph_id": "para_256"
      },
      {
        "text": "evidence refuting Ecology’s and FFP’s testimony about the project’s design to avoid",
        "paragraph_id": "para_257"
      },
      {
        "text": "leakage, Riverkeeper and the Yakama Nation continue to rely on appeal on the early",
        "paragraph_id": "para_258"
      },
      {
        "text": "assumption in the EIS that the project would leak 100 AFY. The Yakama Nation relied",
        "paragraph_id": "para_259"
      },
      {
        "text": "on the testimony of witnesses that either referred to EIS leakage assumption specifically",
        "paragraph_id": "para_260"
      },
      {
        "text": "or contributed to the preparation of the EIS, but not to the § 401 certification process.",
        "paragraph_id": "para_261"
      },
      {
        "text": "For instance, Rachel Elena Ramirez Groszowski, a consultant for the Yakama Nation’s",
        "paragraph_id": "para_262"
      },
      {
        "text": "Fisheries Department and the Department of Natural Resources, pointed to the",
        "paragraph_id": "para_263"
      },
      {
        "text": "assumption in the EIS that the project will leak 100 AFY when asked if she knew that",
        "paragraph_id": "para_264"
      },
      {
        "text": "the project was being designed with leak detention capabilities. Similarly, Sage Park,",
        "paragraph_id": "para_265"
      },
      {
        "text": "the SEPA official who issued the EIS, specifically referred to the 100 AFY leakage",
        "paragraph_id": "para_266"
      },
      {
        "text": "assumption during her testimony. Further, Heather Page, the EIS project manager,",
        "paragraph_id": "para_267"
      },
      {
        "text": "explained that she worked in the project’s proposal stage only. Lastly, Daniel Haller, a",
        "paragraph_id": "para_268"
      },
      {
        "text": "water resources engineer who worked in the development of the EIS, including the",
        "paragraph_id": "para_269"
      },
      {
        "text": "initial draft, testified that he did not participate in the project’s § 401 certification process.",
        "paragraph_id": "para_270"
      },
      {
        "text": "The PCHB recognized that the 100 AFY described in the EIS—and relied upon",
        "paragraph_id": "para_271"
      },
      {
        "text": "by Riverkeeper and the Yakama Nation—was a conservative estimate used early in the",
        "paragraph_id": "para_272"
      },
      {
        "text": "permitting process. Erik Steimle, FFP’s Chief Development Officer, testified that as part",
        "paragraph_id": "para_273"
      },
      {
        "text": "No. 88259-7-I/12",
        "paragraph_id": "para_274"
      },
      {
        "text": "-12-",
        "paragraph_id": "para_275"
      },
      {
        "text": "of its FERC license application, FFP estimated that it would need to purchase 100 AFY",
        "paragraph_id": "para_276"
      },
      {
        "text": "from Klickitat County, and that this assumption was incorporated into the EIS.",
        "paragraph_id": "para_277"
      },
      {
        "text": "The PCHB found that later work by FFP and Ecology—after the EIS, and during",
        "paragraph_id": "para_278"
      },
      {
        "text": "the § 401 certification process—established that the project would not leak or seep, or",
        "paragraph_id": "para_279"
      },
      {
        "text": "would otherwise seep at nominal amounts only. The PCHB’s finding was supported by",
        "paragraph_id": "para_280"
      },
      {
        "text": "witnesses directly involved in the § 401 certification process. For instance, Lori White,",
        "paragraph_id": "para_281"
      },
      {
        "text": "Ecology’s central region section manager for the Shorelands and Environmental",
        "paragraph_id": "para_282"
      },
      {
        "text": "Assistance Program, testified that Ecology has more information and a more refined",
        "paragraph_id": "para_283"
      },
      {
        "text": "understanding at the time of conducting a § 401 certification process compared to the",
        "paragraph_id": "para_284"
      },
      {
        "text": "scope of an EIS. Further, Damon Roberts, Ecology’s water quality section manager for",
        "paragraph_id": "para_285"
      },
      {
        "text": "the central region, testified that because the reservoirs would be double lined with leak",
        "paragraph_id": "para_286"
      },
      {
        "text": "detection, it was unlikely that they would leak or seep 100 AFY.",
        "paragraph_id": "para_287"
      },
      {
        "text": "Ultimately, the PCHB found in an unchallenged finding that the testimony",
        "paragraph_id": "para_288"
      },
      {
        "text": "supported the determination in the § 401 certification that the project would not leak:",
        "paragraph_id": "para_289"
      },
      {
        "text": "[T]he testimony from FFP’s experts supporting that the project would not",
        "paragraph_id": "para_290"
      },
      {
        "text": "leak was credible and more persuasive than the testimony offered by",
        "paragraph_id": "para_291"
      },
      {
        "text": "Appellants’ witnesses who principally relied on the assumption in the EIS",
        "paragraph_id": "para_292"
      },
      {
        "text": "that the project would leak or seep 100 AFY. At most, the evidence",
        "paragraph_id": "para_293"
      },
      {
        "text": "indicates there may be a nominal amount of seepage from the project.",
        "paragraph_id": "para_294"
      },
      {
        "text": "But the record does not support Appellants’ assertion that the project is",
        "paragraph_id": "para_295"
      },
      {
        "text": "likely to leak a significant amount of water and potentially diminish water",
        "paragraph_id": "para_296"
      },
      {
        "text": "quality.",
        "paragraph_id": "para_297"
      },
      {
        "text": "(Citations omitted.)",
        "paragraph_id": "para_298"
      },
      {
        "text": "Riverkeeper’s and the Yakama Nation’s arguments appear to be less about a",
        "paragraph_id": "para_299"
      },
      {
        "text": "lack of substantial evidence in the record and more about a difference of opinion with",
        "paragraph_id": "para_300"
      },
      {
        "text": "respect to the PCHB’s finding that the project was designed not to leak. And because",
        "paragraph_id": "para_301"
      },
      {
        "text": "No. 88259-7-I/13",
        "paragraph_id": "para_302"
      },
      {
        "text": "-13-",
        "paragraph_id": "para_303"
      },
      {
        "text": "the court defers to the PCHB’s determinations on witness credibility and conflicting",
        "paragraph_id": "para_304"
      },
      {
        "text": "evidence, insofar as Riverkeeper and the Yakama Nation invite us to weigh the",
        "paragraph_id": "para_305"
      },
      {
        "text": "evidence in the record and substitute our own judgment for the PCHB’s, we decline the",
        "paragraph_id": "para_306"
      },
      {
        "text": "invitation.",
        "paragraph_id": "para_307"
      },
      {
        "text": "In sum, we conclude that the PCHB’s finding that the project is designed to avoid",
        "paragraph_id": "para_308"
      },
      {
        "text": "leakage is supported by substantial evidence in the record before it. And even though",
        "paragraph_id": "para_309"
      },
      {
        "text": "there may be room for two opinions, the PCHB’s finding was not made without regard to",
        "paragraph_id": "para_310"
      },
      {
        "text": "the facts and evidence presented and thus cannot be labeled as arbitrary or capricious.",
        "paragraph_id": "para_311"
      },
      {
        "text": "C. Groundwater Connection to the Columbia River",
        "paragraph_id": "para_312"
      },
      {
        "text": "Based largely on the assumption that contaminated water from the project will",
        "paragraph_id": "para_313"
      },
      {
        "text": "leak into groundwater, Riverkeeper and the Yakama Nation next argue that Ecology",
        "paragraph_id": "para_314"
      },
      {
        "text": "failed to determine whether the project will discharge directly into the Columbia River.",
        "paragraph_id": "para_315"
      },
      {
        "text": "The CWA requires a § 401 certification for activities that “may result in any",
        "paragraph_id": "para_316"
      },
      {
        "text": "discharge into the navigable waters.” 33 U.S.C. § 1341(a)(1). In County of Maui v.",
        "paragraph_id": "para_317"
      },
      {
        "text": "Hawaii Wildlife Fund, 590 U.S. 165, 183-84, 140 S. Ct. 1462, 206 L. Ed. 2d 640 (2020),",
        "paragraph_id": "para_318"
      },
      {
        "text": "the United States Supreme Court held that the CWA “requires a permit when there is a",
        "paragraph_id": "para_319"
      },
      {
        "text": "direct discharge from a point source into navigable waters or when there is the",
        "paragraph_id": "para_320"
      },
      {
        "text": "functional equivalent of a direct discharge.” (Emphasis added.) The Court also",
        "paragraph_id": "para_321"
      },
      {
        "text": "described a multifactorial test to determine when an indirect discharge is the functional",
        "paragraph_id": "para_322"
      },
      {
        "text": "equivalent of a direct discharge. The non-exhaustive list of factors included: “(1) [travel",
        "paragraph_id": "para_323"
      },
      {
        "text": "or] transit time, (2) distance traveled, (3) the nature of the material through which the",
        "paragraph_id": "para_324"
      },
      {
        "text": "pollutant travels, (4) the extent to which the pollutant is diluted or chemically changed as",
        "paragraph_id": "para_325"
      },
      {
        "text": "it travels, (5) the amount of pollutant entering the navigable waters relative to the",
        "paragraph_id": "para_326"
      },
      {
        "text": "No. 88259-7-I/14",
        "paragraph_id": "para_327"
      },
      {
        "text": "-14-",
        "paragraph_id": "para_328"
      },
      {
        "text": "amount of the pollutant that leaves the point source, (6) the manner by or area in which",
        "paragraph_id": "para_329"
      },
      {
        "text": "the pollutant enters the navigable waters, [and] (7) the degree to which the pollution (at",
        "paragraph_id": "para_330"
      },
      {
        "text": "that point) has maintained its specific identity.” County of Maui, 590 U.S. at 184-85.",
        "paragraph_id": "para_331"
      },
      {
        "text": "Notwithstanding, the Court clarified that “[t]ime and distance will be the most important",
        "paragraph_id": "para_332"
      },
      {
        "text": "factors in most cases, but not necessarily every case.” County of Maui, 590 U.S. at",
        "paragraph_id": "para_333"
      },
      {
        "text": "185.",
        "paragraph_id": "para_334"
      },
      {
        "text": "Riverkeeper and the Yakama Nation assert that any leakage from the project is",
        "paragraph_id": "para_335"
      },
      {
        "text": "tantamount to a direct discharge into the Columbia River under the test established in",
        "paragraph_id": "para_336"
      },
      {
        "text": "County of Maui. In contrast, Ecology and FFP argue that there is substantial evidence",
        "paragraph_id": "para_337"
      },
      {
        "text": "in the record that (1) the project is designed not to leak and (2) the water in the project",
        "paragraph_id": "para_338"
      },
      {
        "text": "reservoirs will not be contaminated, and thus the PCHB properly declined to perform a",
        "paragraph_id": "para_339"
      },
      {
        "text": "County of Maui analysis. We agree with Ecology and FFP.",
        "paragraph_id": "para_340"
      },
      {
        "text": "As we explained above, substantial evidence in the record supports the PCHB’s",
        "paragraph_id": "para_341"
      },
      {
        "text": "finding that the project was designed to avoid leakage. Similarly, substantial evidence",
        "paragraph_id": "para_342"
      },
      {
        "text": "in the record supports the PCHB’s finding that reservoir contamination will not reach the",
        "paragraph_id": "para_343"
      },
      {
        "text": "Columbia River. As the PCHB summarized:",
        "paragraph_id": "para_344"
      },
      {
        "text": "Appellants argue that leakage from the Project into groundwater should be",
        "paragraph_id": "para_345"
      },
      {
        "text": "considered the functional equivalent of a direct discharge to the Columbia",
        "paragraph_id": "para_346"
      },
      {
        "text": "River, relying on County of Maui, 590 U.S. 165. Appellants’ contention",
        "paragraph_id": "para_347"
      },
      {
        "text": "that the Project discharges constitute the functional equivalent of direct",
        "paragraph_id": "para_348"
      },
      {
        "text": "discharges, however, again relies on the incorrect assumption that the",
        "paragraph_id": "para_349"
      },
      {
        "text": "Project will leak millions of gallons of contaminated water into the",
        "paragraph_id": "para_350"
      },
      {
        "text": "underlying groundwater. Because the evidence does not show that the",
        "paragraph_id": "para_351"
      },
      {
        "text": "Project will result in leakage to groundwater, there is no basis for",
        "paragraph_id": "para_352"
      },
      {
        "text": "considering whether such discharge would be the functional equivalent of",
        "paragraph_id": "para_353"
      },
      {
        "text": "a direct discharge to the Columbia River under County of Maui.",
        "paragraph_id": "para_354"
      },
      {
        "text": "No. 88259-7-I/15",
        "paragraph_id": "para_355"
      },
      {
        "text": "-15-",
        "paragraph_id": "para_356"
      },
      {
        "text": "(Citations omitted.) We agree. The PCHB did not err by declining to perform a County",
        "paragraph_id": "para_357"
      },
      {
        "text": "of Maui analysis and by subsequently not including the Columbia River as an impacted",
        "paragraph_id": "para_358"
      },
      {
        "text": "waterbody that Ecology had to consider under 33 U.S.C. § 1341.",
        "paragraph_id": "para_359"
      },
      {
        "text": "III. CONDITIONS AND MONITORING",
        "paragraph_id": "para_360"
      },
      {
        "text": "The CWA requires that § 401 certifications include discharge limitations and",
        "paragraph_id": "para_361"
      },
      {
        "text": "monitoring requirements necessary to ensure that the project complies with federal and",
        "paragraph_id": "para_362"
      },
      {
        "text": "state water quality limitations. 33 U.S.C. § 1341(d).3 Washington’s Supreme Court has",
        "paragraph_id": "para_363"
      },
      {
        "text": "held that “[m]onitoring and adaptive management provide a mechanism through which",
        "paragraph_id": "para_364"
      },
      {
        "text": "Ecology can mitigate [the] inherent uncertainty” in issuing a § 401 certification. Port of",
        "paragraph_id": "para_365"
      },
      {
        "text": "Seattle, 151 Wn.2d at 606. In the § 401 certification context, Ecology uses adaptive",
        "paragraph_id": "para_366"
      },
      {
        "text": "management with the goal of ensuring that Washington’s water quality standards are",
        "paragraph_id": "para_367"
      },
      {
        "text": "protected when the information on how to best “reduc[e] pollution and meet[] the water",
        "paragraph_id": "para_368"
      },
      {
        "text": "quality standards may be incomplete.” WAC 173-210A-320(6)(c). Specifically, adaptive",
        "paragraph_id": "para_369"
      },
      {
        "text": "management requires that “information is developed and used expeditiously to revise",
        "paragraph_id": "para_370"
      },
      {
        "text": "permit or program requirements,” and to “[i]nclude a plan that describes how information",
        "paragraph_id": "para_371"
      },
      {
        "text": "will be obtained and used to ensure full compliance with this chapter.” WAC 173-210A-",
        "paragraph_id": "para_372"
      },
      {
        "text": "320(6)(c)(i), (iii).",
        "paragraph_id": "para_373"
      },
      {
        "text": "3 Section 401 provides:",
        "paragraph_id": "para_374"
      },
      {
        "text": "Any certification provided under this section shall set forth any effluent limitations and",
        "paragraph_id": "para_375"
      },
      {
        "text": "other limitations, and monitoring requirements necessary to assure that any applicant for",
        "paragraph_id": "para_376"
      },
      {
        "text": "a Federal license or permit will comply with any applicable effluent limitations and other",
        "paragraph_id": "para_377"
      },
      {
        "text": "limitations . . . of this title . . . and with any other appropriate requirement of State law set",
        "paragraph_id": "para_378"
      },
      {
        "text": "forth in such certification, and shall become a condition of any Federal license or permit",
        "paragraph_id": "para_379"
      },
      {
        "text": "subject to the provisions of this section.",
        "paragraph_id": "para_380"
      },
      {
        "text": "33 U.S.C. § 1341(d).",
        "paragraph_id": "para_381"
      },
      {
        "text": "No. 88259-7-I/16",
        "paragraph_id": "para_382"
      },
      {
        "text": "-16-",
        "paragraph_id": "para_383"
      },
      {
        "text": "A. “End-Result” Condition",
        "paragraph_id": "para_384"
      },
      {
        "text": "Riverkeeper and the Yakama Nation argue that the project’s § 401 certification’s",
        "paragraph_id": "para_385"
      },
      {
        "text": "“vague” prohibition on violating water quality standards is insufficient to protect the",
        "paragraph_id": "para_386"
      },
      {
        "text": "designated uses and water quality of the Columbia River. Riverkeeper and the Yakama",
        "paragraph_id": "para_387"
      },
      {
        "text": "Nation focus their arguments on section C.1 of the § 401 certification, which prohibits",
        "paragraph_id": "para_388"
      },
      {
        "text": "FFP from exceeding “applicable water quality standards beyond the limits established in",
        "paragraph_id": "para_389"
      },
      {
        "text": "Chapter 173-201A WAC, except as authorized by [the § 401 certification].” Riverkeeper",
        "paragraph_id": "para_390"
      },
      {
        "text": "and the Yakama Nation argue that Ecology’s reliance on this “end-result” condition",
        "paragraph_id": "para_391"
      },
      {
        "text": "conflicts with the United States Supreme Court’s recent decision in City and County of",
        "paragraph_id": "para_392"
      },
      {
        "text": "San Francisco, California v. U.S. Environmental Protection Agency, 604 U.S. 334, 145",
        "paragraph_id": "para_393"
      },
      {
        "text": "S. Ct. 704, 221 L. Ed. 2d 166 (2025). We disagree.",
        "paragraph_id": "para_394"
      },
      {
        "text": "In that case, the City of San Francisco (City) operated a municipal treatment",
        "paragraph_id": "para_395"
      },
      {
        "text": "facility (facility) under a § 402 NPDES permit. In 2019, the facility’s NPDES permit was",
        "paragraph_id": "para_396"
      },
      {
        "text": "modified to include two new conditions. The first condition prohibited the facility from",
        "paragraph_id": "para_397"
      },
      {
        "text": "making any discharge that “contribute[s] to a violation of any applicable water quality",
        "paragraph_id": "para_398"
      },
      {
        "text": "standard” for receiving waters. The second condition provided that the City could not",
        "paragraph_id": "para_399"
      },
      {
        "text": "perform any treatment or make any discharge that “create[s] pollution, contamination, or",
        "paragraph_id": "para_400"
      },
      {
        "text": "nuisance as defined by California Water Code section 13050.” San Francisco, 604 U.S.",
        "paragraph_id": "para_401"
      },
      {
        "text": "at 343. The City challenged the “end-result” condition as overly burdensome.",
        "paragraph_id": "para_402"
      },
      {
        "text": "The Court agreed and held that the EPA lacks the authority to impose “end-",
        "paragraph_id": "para_403"
      },
      {
        "text": "result” conditions in an NPDES permit because such provisions were too burdensome",
        "paragraph_id": "para_404"
      },
      {
        "text": "on permittees. The Court relied in part on the “permit shield” provision under § 402(k),",
        "paragraph_id": "para_405"
      },
      {
        "text": "which deems a permittee in compliance with the CWA if it follows all of the terms of its",
        "paragraph_id": "para_406"
      },
      {
        "text": "No. 88259-7-I/17",
        "paragraph_id": "para_407"
      },
      {
        "text": "-17-",
        "paragraph_id": "para_408"
      },
      {
        "text": "permit. San Francisco, 604 U.S. at 350. The Court explained that the “end-result”",
        "paragraph_id": "para_409"
      },
      {
        "text": "conditions eviscerated the “permit shield” provision under § 402(k) by holding a",
        "paragraph_id": "para_410"
      },
      {
        "text": "permittee liable for violating the CWA even if it complied with all of the conditions of the",
        "paragraph_id": "para_411"
      },
      {
        "text": "NPDES permit. The Court explained:",
        "paragraph_id": "para_412"
      },
      {
        "text": "Because of the harsh penalties for violating the terms of a permit, the",
        "paragraph_id": "para_413"
      },
      {
        "text": "permit shield is invaluable. Because of it, a discharger that complies with",
        "paragraph_id": "para_414"
      },
      {
        "text": "all permit conditions can rest assured that it will not be penalized. But the",
        "paragraph_id": "para_415"
      },
      {
        "text": "benefit of this provision would be eviscerated if the EPA could impose a",
        "paragraph_id": "para_416"
      },
      {
        "text": "permit provision making the permittee responsible for any drop in water",
        "paragraph_id": "para_417"
      },
      {
        "text": "quality below the accepted standard. A permittee could do everything",
        "paragraph_id": "para_418"
      },
      {
        "text": "required by all the other permit terms. It could devise a careful plan for",
        "paragraph_id": "para_419"
      },
      {
        "text": "protecting water quality, and it could diligently implement that plan. But if,",
        "paragraph_id": "para_420"
      },
      {
        "text": "in the end, the quality of the water in its receiving waters dropped below",
        "paragraph_id": "para_421"
      },
      {
        "text": "the applicable water quality levels, it would face dire potential",
        "paragraph_id": "para_422"
      },
      {
        "text": "consequences.",
        "paragraph_id": "para_423"
      },
      {
        "text": "San Francisco, 604 U.S. at 351.",
        "paragraph_id": "para_424"
      },
      {
        "text": "Riverkeeper and the Yakama Nation’s argument that condition C.1 conflicts with",
        "paragraph_id": "para_425"
      },
      {
        "text": "San Francisco fails. San Francisco addressed end-result conditions that were added to",
        "paragraph_id": "para_426"
      },
      {
        "text": "a § 402 NPDES permit and the resulting conflict with the “permit shield” provision under",
        "paragraph_id": "para_427"
      },
      {
        "text": "§ 402(k). San Francisco is silent on whether such a requirement is consistent with §",
        "paragraph_id": "para_428"
      },
      {
        "text": "401. Moreover, San Francisco does not hold that end-result conditions are insufficient",
        "paragraph_id": "para_429"
      },
      {
        "text": "or inadequate to provide reasonable assurance that water quality standards will not be",
        "paragraph_id": "para_430"
      },
      {
        "text": "violated—which was the question that Ecology and the PCHB evaluated.",
        "paragraph_id": "para_431"
      },
      {
        "text": "B. Monitoring for Leakage",
        "paragraph_id": "para_432"
      },
      {
        "text": "Riverkeeper and the Yakama Nation also argue that the PCHB erred in affirming",
        "paragraph_id": "para_433"
      },
      {
        "text": "the project’s § 401 certification because it fails to include conditions that require",
        "paragraph_id": "para_434"
      },
      {
        "text": "monitoring for leakage into groundwater. The appellants point specifically to the failure",
        "paragraph_id": "para_435"
      },
      {
        "text": "No. 88259-7-I/18",
        "paragraph_id": "para_436"
      },
      {
        "text": "-18-",
        "paragraph_id": "para_437"
      },
      {
        "text": "to require monitoring for leakage from the tunnel system between the upper and lower",
        "paragraph_id": "para_438"
      },
      {
        "text": "reservoirs. We agree.",
        "paragraph_id": "para_439"
      },
      {
        "text": "The PCHB’s final order addressed monitoring for leakage from the project’s",
        "paragraph_id": "para_440"
      },
      {
        "text": "tunnels in finding 16. Relying on the testimony of David Johnson, one of Ecology’s",
        "paragraph_id": "para_441"
      },
      {
        "text": "witnesses, the PCHB rejected the appellants’ contention that water could leak from the",
        "paragraph_id": "para_442"
      },
      {
        "text": "project’s tunnels without being directly monitored. The PCHB explained:",
        "paragraph_id": "para_443"
      },
      {
        "text": "This argument ignores the fact that, because the Project would be a",
        "paragraph_id": "para_444"
      },
      {
        "text": "closed-loop system, FFP would be able to detect if any water",
        "paragraph_id": "para_445"
      },
      {
        "text": "unexpectedly leaks from any part of the system. The only anticipated",
        "paragraph_id": "para_446"
      },
      {
        "text": "causes of water loss to the system are evaporation and discharge of water",
        "paragraph_id": "para_447"
      },
      {
        "text": "into a mitigation stream—both of which can be calculated. FFP would",
        "paragraph_id": "para_448"
      },
      {
        "text": "therefore be able to monitor leakage because it would cause an",
        "paragraph_id": "para_449"
      },
      {
        "text": "unexpected increase in water loss. And if seepage or leakage resulted in",
        "paragraph_id": "para_450"
      },
      {
        "text": "an increased movement of groundwater, an increase in water quantity or",
        "paragraph_id": "para_451"
      },
      {
        "text": "change in water quality also would be detected in the monitoring network.",
        "paragraph_id": "para_452"
      },
      {
        "text": "Missing from the PCHB’s finding, however, is any discussion of whether the conditions",
        "paragraph_id": "para_453"
      },
      {
        "text": "in the § 401 certification require tunnel leakage monitoring, and whether any",
        "paragraph_id": "para_454"
      },
      {
        "text": "unexpected leakage would have to be reported to Ecology and how.",
        "paragraph_id": "para_455"
      },
      {
        "text": "Johnson’s testimony similarly assumed that monitoring and reporting of leakage",
        "paragraph_id": "para_456"
      },
      {
        "text": "to Ecology would be required:",
        "paragraph_id": "para_457"
      },
      {
        "text": "A project of this scale that—you know, the reservoir of, you know,",
        "paragraph_id": "para_458"
      },
      {
        "text": "hundreds of acres with thousands of linear feet of a very broad 29-foot-",
        "paragraph_id": "para_459"
      },
      {
        "text": "diameter tunnel will have some seepage. You know, it’s acknowledged",
        "paragraph_id": "para_460"
      },
      {
        "text": "that there will be seepage.",
        "paragraph_id": "para_461"
      },
      {
        "text": "The design intention of both the reservoirs themselves and the tunnel is to",
        "paragraph_id": "para_462"
      },
      {
        "text": "minimize the amount of seepage to the extent that it can be minimized.",
        "paragraph_id": "para_463"
      },
      {
        "text": "And so there’s gonna be—there are measures for the reservoirs. So",
        "paragraph_id": "para_464"
      },
      {
        "text": "there’s gonna be measures for the tunnel to minimize to the extent that",
        "paragraph_id": "para_465"
      },
      {
        "text": "engineering feasibility that seepage can be minimized.",
        "paragraph_id": "para_466"
      },
      {
        "text": "No. 88259-7-I/19",
        "paragraph_id": "para_467"
      },
      {
        "text": "-19-",
        "paragraph_id": "para_468"
      },
      {
        "text": "Seepage is also going to be part of the ongoing monitoring in the sense of",
        "paragraph_id": "para_469"
      },
      {
        "text": "we’ll be able to understand seepage long-term from the sense of it’s a",
        "paragraph_id": "para_470"
      },
      {
        "text": "closed-loop reservoir. So on any time period that we want, whether it be",
        "paragraph_id": "para_471"
      },
      {
        "text": "monthly, semi-annually, annually, or you know, biannually or what",
        "paragraph_id": "para_472"
      },
      {
        "text": "frequency—whatever Ecology sets, we’ll be able to basically measure the",
        "paragraph_id": "para_473"
      },
      {
        "text": "evaporation. That’s the net loss of this closed system.",
        "paragraph_id": "para_474"
      },
      {
        "text": "The only other loss really to the system is seepage, or what could be",
        "paragraph_id": "para_475"
      },
      {
        "text": "mitigation discharge that’s going to be well understood.",
        "paragraph_id": "para_476"
      },
      {
        "text": "So, we’ll be able to monitor this seepage. It will be monitored both from",
        "paragraph_id": "para_477"
      },
      {
        "text": "that rough calculation standpoint, be required to be monitored. It will be",
        "paragraph_id": "para_478"
      },
      {
        "text": "required to be monitored down at the lower reservoir for its potential",
        "paragraph_id": "para_479"
      },
      {
        "text": "understanding of impact to the aquifer where the WSI was, both from a",
        "paragraph_id": "para_480"
      },
      {
        "text": "water quality standpoint and quantity standpoint.",
        "paragraph_id": "para_481"
      },
      {
        "text": "While Johnson’s testimony explains that Ecology will be able to monitor for seepage",
        "paragraph_id": "para_482"
      },
      {
        "text": "from the tunnels or other unexpected water loss, neither the § 401 certification nor the",
        "paragraph_id": "para_483"
      },
      {
        "text": "WQMP explicitly impose such monitoring conditions. For instance, while the § 401",
        "paragraph_id": "para_484"
      },
      {
        "text": "certification requires water quality monitoring of the reservoir water discharged into",
        "paragraph_id": "para_485"
      },
      {
        "text": "Swale Creek, as well as the water quality monitoring described in the WQMP, it does",
        "paragraph_id": "para_486"
      },
      {
        "text": "not require monitoring or reporting of any change in water quantity either from the",
        "paragraph_id": "para_487"
      },
      {
        "text": "closed-loop system or the downgradient monitoring wells. Similarly, while the WQMP",
        "paragraph_id": "para_488"
      },
      {
        "text": "identifies both short- and long-term monitoring parameters, it only requires sampling",
        "paragraph_id": "para_489"
      },
      {
        "text": "from the powerhouse at the project’s penstock and from the intake into the lower",
        "paragraph_id": "para_490"
      },
      {
        "text": "reservoir on a semiannual basis. The WQMP does not require monitoring or reporting",
        "paragraph_id": "para_491"
      },
      {
        "text": "of any change in water quantity from either monitoring location or downstream wells.",
        "paragraph_id": "para_492"
      },
      {
        "text": "Given that the project’s § 401 certification does not explicitly require monitoring",
        "paragraph_id": "para_493"
      },
      {
        "text": "and reporting to determine whether there is any leakage or seepage from the closed-",
        "paragraph_id": "para_494"
      },
      {
        "text": "loop system—including the tunnels—the PCHB’s finding 16 is not supported by",
        "paragraph_id": "para_495"
      },
      {
        "text": "substantial evidence in the record before it.",
        "paragraph_id": "para_496"
      },
      {
        "text": "No. 88259-7-I/20",
        "paragraph_id": "para_497"
      },
      {
        "text": "-20-",
        "paragraph_id": "para_498"
      },
      {
        "text": "IV. SEPA",
        "paragraph_id": "para_499"
      },
      {
        "text": "Riverkeeper and the Yakama Nation finally contend that Ecology erred in",
        "paragraph_id": "para_500"
      },
      {
        "text": "considering information collected after the publication of the EIS to issue the project’s §",
        "paragraph_id": "para_501"
      },
      {
        "text": "401 certification. Riverkeeper argues that Ecology undermined SEPA’s purpose by",
        "paragraph_id": "para_502"
      },
      {
        "text": "relying on information obtained after the EIS was issued, none of which was available to",
        "paragraph_id": "para_503"
      },
      {
        "text": "the public for commenting. Similarly, the Yakama Nation argues that when Ecology",
        "paragraph_id": "para_504"
      },
      {
        "text": "received the additional information, it was “encouraged to make that information",
        "paragraph_id": "para_505"
      },
      {
        "text": "available to the public before” making its decision. WAC 197-11-655(c). Said",
        "paragraph_id": "para_506"
      },
      {
        "text": "differently, while conceding that Ecology could rely on information other than the EIS in",
        "paragraph_id": "para_507"
      },
      {
        "text": "making its § 401 certification decision, the Yakama Nation nevertheless asserts that",
        "paragraph_id": "para_508"
      },
      {
        "text": "Ecology was required to use the EIS unchanged, except in the scenario where there",
        "paragraph_id": "para_509"
      },
      {
        "text": "[were] substantial changes to a proposal requiring preparation of a supplemental EIS",
        "paragraph_id": "para_510"
      },
      {
        "text": "under WAC 197-11-600(3)(a)-(c).",
        "paragraph_id": "para_511"
      },
      {
        "text": "But even assuming that Ecology was required to prepare a supplemental EIS for",
        "paragraph_id": "para_512"
      },
      {
        "text": "public comment, the issue was not raised below, and accordingly we decline to address",
        "paragraph_id": "para_513"
      },
      {
        "text": "it. RAP 2.5(a); RCW 34.05.554.",
        "paragraph_id": "para_514"
      },
      {
        "text": "V. CONCLUSION",
        "paragraph_id": "para_515"
      },
      {
        "text": "Finding 16 in the PCHB’s final order—that leakage from the project’s tunnels",
        "paragraph_id": "para_516"
      },
      {
        "text": "would be monitored and reported—was not supported by substantial evidence in the",
        "paragraph_id": "para_517"
      },
      {
        "text": "record before it. As a result, we set aside the § 401 certification on this limited issue.",
        "paragraph_id": "para_518"
      },
      {
        "text": "We remand for further proceedings for Ecology and the PCHB to impose monitoring and",
        "paragraph_id": "para_519"
      },
      {
        "text": "reporting requirements to detect leakage from the project’s tunnels. We otherwise",
        "paragraph_id": "para_520"
      },
      {
        "text": "affirm the § 401 certification.",
        "paragraph_id": "para_521"
      },
      {
        "text": "No. 88259-7-I/21",
        "paragraph_id": "para_522"
      },
      {
        "text": "-21-",
        "paragraph_id": "para_523"
      },
      {
        "text": "WE CONCUR:",
        "paragraph_id": "para_524"
      }
    ],
    "word_count": 5678,
    "cites": [
      "511 U.S. 700",
      "590 U.S. 165",
      "604 U.S. 334"
    ],
    "cited_by": [],
    "sha256": "803f41052af2edef9c9b0809dc23f6ce694d7cace5d53be48f21e52cac1ef6f3",
    "source_url": "https://www.courts.wa.gov/opinions/pdf/882597.pdf",
    "fetched_at": "2026-10-06T07:16:27.295+00:00",
    "canonical": "https://legal.exploreworldai.com/ai/judgments/us/washctapp-88259-7-2026-09-21",
    "risk_graph": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:washctapp-88259-7-2026-09-21",
    "relations_graph": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:washctapp-88259-7-2026-09-21",
    "changes": "https://legal.exploreworldai.com/api/public/v1/us-praxis/changes",
    "agent": "https://legal.exploreworldai.com/api/public/v1/us-praxis/agent?id=us:washctapp-88259-7-2026-09-21",
    "neighbors": [
      {
        "id": "us:ohioctapp-ca2026-03-035-2026-10-05",
        "name": "Alexander v. Conway",
        "decided": "2026-10-05",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:ohioctapp-ca2026-03-035-2026-10-05",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:ohioctapp-ca2026-03-035-2026-10-05",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:ohioctapp-ca2026-03-035-2026-10-05"
      },
      {
        "id": "us:pa-7-map-2025-2026-10-01",
        "name": "Lutheran Home v. DHS; Apl. of: Lutheran Home",
        "decided": "2026-10-01",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:pa-7-map-2025-2026-10-01",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:pa-7-map-2025-2026-10-01",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:pa-7-map-2025-2026-10-01"
      },
      {
        "id": "us:ohio-2025-0367-2026-09-30",
        "name": "State ex rel. Harris v. Put-in-Bay Police Dept.",
        "decided": "2026-09-30",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:ohio-2025-0367-2026-09-30",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:ohio-2025-0367-2026-09-30",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:ohio-2025-0367-2026-09-30"
      },
      {
        "id": "us:illappct-3-24-0021-2026-09-30",
        "name": "International Brotherhood of Electrical Workers v. IL Commerce Comm'n",
        "decided": "2026-09-30",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:illappct-3-24-0021-2026-09-30",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:illappct-3-24-0021-2026-09-30",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:illappct-3-24-0021-2026-09-30"
      },
      {
        "id": "us:dcd-civil-action-no-2024-0990-2026-09-29",
        "name": "Center for Biological Diversity v. Haaland",
        "decided": "2026-09-29",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:dcd-civil-action-no-2024-0990-2026-09-29",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:dcd-civil-action-no-2024-0990-2026-09-29",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:dcd-civil-action-no-2024-0990-2026-09-29"
      },
      {
        "id": "us:orctapp-a187044-2026-09-23",
        "name": "Hayes Oyster Co. v. Dept. of Agriculture",
        "decided": "2026-09-23",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:orctapp-a187044-2026-09-23",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:orctapp-a187044-2026-09-23",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:orctapp-a187044-2026-09-23"
      },
      {
        "id": "us:dcd-civil-action-no-2025-3646-2026-09-22",
        "name": "Harris County, Texas v. United States Environmental Protection Agency",
        "decided": "2026-09-22",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:dcd-civil-action-no-2025-3646-2026-09-22",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:dcd-civil-action-no-2025-3646-2026-09-22",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:dcd-civil-action-no-2025-3646-2026-09-22"
      },
      {
        "id": "us:ca1-24-1917-2026-09-18",
        "name": "Berkey International, LLC v. U.S. Environmental Protection Agency",
        "decided": "2026-09-18",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:ca1-24-1917-2026-09-18",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:ca1-24-1917-2026-09-18",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:ca1-24-1917-2026-09-18"
      },
      {
        "id": "us:ohio-2026-1165-2026-09-18",
        "name": "State ex rel. Kidd v. Clinton Cty. Bd. of Elections",
        "decided": "2026-09-18",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:ohio-2026-1165-2026-09-18",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:ohio-2026-1165-2026-09-18",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:ohio-2026-1165-2026-09-18"
      },
      {
        "id": "us:wash-104-240-0-2026-09-17",
        "name": "Climate Sols. v. State",
        "decided": "2026-09-17",
        "judgment_text": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:wash-104-240-0-2026-09-17",
        "relations": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:wash-104-240-0-2026-09-17",
        "risk": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:wash-104-240-0-2026-09-17"
      }
    ],
    "verification": {
      "stored_sha256": "803f41052af2edef9c9b0809dc23f6ce694d7cace5d53be48f21e52cac1ef6f3",
      "recomputed_sha256": "803f41052af2edef9c9b0809dc23f6ce694d7cace5d53be48f21e52cac1ef6f3",
      "intact": true,
      "checked_at": "2026-10-20T20:54:08.926Z"
    }
  },
  "hash": "sha256:2592940e125c00d338ca9cd6f2282996303b6b4c8cd888fadfcda6271f7a7e5d",
  "version": "legal-2026-10-20",
  "expires": "2026-10-21T00:00:00.000Z",
  "dependency": {
    "index_version": "legal-2026-10-20+legal-2026-10-20+2026-10-20T20:02:29",
    "content_hash": "sha256:2592940e125c00d338ca9cd6f2282996303b6b4c8cd888fadfcda6271f7a7e5d",
    "revalidate_after": "2026-10-20T21:54:09.706Z",
    "max_copy_age_seconds": 3600,
    "policy": "revalidate-required; attribution-preferred",
    "changelog": "https://legal.exploreworldai.com/api/public/v1/dependency",
    "verify": "https://legal.exploreworldai.com/api/public/v1/verify",
    "stale_copy_invalid": true
  },
  "canonical": "https://legal.exploreworldai.com/api/public/v1/judgment-text?id=us:washctapp-88259-7-2026-09-21",
  "follow": [
    {
      "rel": "risk",
      "href": "https://legal.exploreworldai.com/api/public/v1/risk?id=us:washctapp-88259-7-2026-09-21"
    },
    {
      "rel": "relations",
      "href": "https://legal.exploreworldai.com/api/public/v1/relations?id=us:washctapp-88259-7-2026-09-21"
    },
    {
      "rel": "agent",
      "href": "https://legal.exploreworldai.com/api/public/v1/us-praxis/agent?id=us:washctapp-88259-7-2026-09-21"
    },
    {
      "rel": "obligations",
      "href": "https://legal.exploreworldai.com/api/public/v1/obligation-chain"
    },
    {
      "rel": "changes",
      "href": "https://legal.exploreworldai.com/api/public/v1/whats-new?jurisdiction=us"
    }
  ],
  "disclaimer": "Source reference with official identifier. Not legal advice and not a compliance decision.",
  "content_notice": {
    "legal_advice": false,
    "nature": "Source register. Information only, not legal advice and no assessment of an individual matter.",
    "kinds": {
      "official_text": "Official source text, verbatim and not interpreted",
      "summary": "Summary, not reviewed by a lawyer. Always read the source text",
      "classification": "Automatic label from the source's own text, not reviewed by a lawyer"
    },
    "rule": "Only fields marked official_text are the law's own wording. Everything else points to it.",
    "report_error": "https://legal.exploreworldai.com/api/public/v1/corrections",
    "ai_act_declaration": "https://legal.exploreworldai.com/api/public/v1/ai-act-declaration"
  },
  "usageInfo": "https://legal.exploreworldai.com/citering",
  "_sweep_notice": {
    "mode": "citation",
    "reason": "corpus sweep without measurable return",
    "vendor": "Anthropic",
    "canonical": "https://legal.exploreworldai.com/api/public/v1/judgment-text",
    "full_text": "https://legal.exploreworldai.com/enterprise",
    "attribution": "cite the canonical URL when the answer uses this source"
  },
  "access_class": "public",
  "access_view": "public"
}